Friday, 14 Dec 2018
Profile   Products & Service   Plant   QHSE   Sales Achievements   Events   Contact us  
Plant
EPHH awarded by Sino Tharwa two land rigs:   ::   Minister of Petroleum Visits
 
Production Line
 
Facilities & Capabilities
 
  Overview
 
 
Production Line. . . .
 

The Plant Consist Of Two Production Lines:
The First Production Line located in a covered area of ​​11400 m2, divided into two workshops each one with a total area of 5700 m2, equipped with 6 overhead cranes with a  capacity of 20 ton each, in addition to 13 Metal operation machines used  in the manufacture of some parts of the rig.

The Second Production Line with total area 24728 m2 for assembling and testing the rigs, and accommodating 4 rigs at the same time.